HOME  /  SEARCH
International Journal Papers
International Conference
Domestic Journal Papers (English)
Domestic Journal Papers (Korean)
Domestic Conference
Patent
Software Program
 
 Home > PUBLICATIONS > International Journal Papers > 2010

 2011
  1. Park, J. and Hong, T. (2011). “Process of Community-based Sustainable CO2 Management.” Journal of Construction Engineering and Project Management, 1(1), 11-17.
  2. Hyun, C., Hong, T., Ji, S., Yu, J., and An, S. (2011). The Development of Probabilistic time and Cost Data: Focus on Field Conditions and Labor Productivity." Journal of Construction Engineering and Project Management, 1(1), 37-42.
  3. Jeong, J., Hastak, M., Syal, M., and Hong, T. (2011). “Internal Relationship Modeling and Production Planning Optimization for the Manufactured Housing.” Journal of Automation in Construction, 20(7), 864-873  (SCIE).
  4. Koo, C., Hong, T., and Hyun, C. (2011). "The Development of a Construction Cost Prediction Model with Improved Prediction Capacity using the Advanced CBR Approach." International Journal of Expert Systems with Applications, 38(7), 8597-8606 (SCIE).
  5. Park, J. and Hong, T. (2011) “Maintenance Management Process for reducing CO2 emission in the Complex Shopping Mall Complexes.” Energy and Buildings, 43(4), 894-904 (SCIE).
  6. Cho. K., Hong, T., and Hyun, C. (2011). “Scheduling Model for Repetitive Construction Processes for High-Rise Buildings.” Canadian Journal of Civil Engineering, 38(1), 36-48 (SCI).
  7. Kim, G., Hong, T., Han, S., and Lee, S. (2011). “Analysis of the Development Cost based on the Planning Characteristics of Multi-Family Housing Development Projects.” Journal of Urban Planning and Development, 137(3), 207-219 (SCIE & SSCI).
  8. Hong, T., Cho, K., Hyun, C., and Han, S. (2011). "A Simulation-based Schedule Control Estimation Model for ACS-based Core Wall Construction of High-Rise Building." Journal of Construction Engineering and Management, 137(6), 393-402 (SCIE).
  9. Han, S., Hong, T., Kim, G., and Lee, S. (2011). "Technical Comparisons of Simulation-Based Productivity Prediction Methodologies by means of Estimation Tools focusing on Conventional Earthmovings." Journal of Civil Engineering and Management, 17(2), 265-277 (SCIE).
  10. Hong, T., Hyun, C., and Moon, H. (2011). "CBR-based Cost Prediction Model-II of the Design Phase for Multi-Family Housing Projects." Expert Systems with Applications, 38(3), 2797-2808 (SCIE).
  11. Moon, H.,Cho, K.,Hong, T., and Hyun, C. (2011). “Selection Model of Delivery Methods for Multi-Family Housing Construction Projects.” Journal of Management in Engineering, 27(2), 109-115. (SCIE).
목록보기 

이동:  


이용약관 | 개인정보취급방침 | 이메일주소무단수집거부 | 청소년보호정책 | ADMIN
서울특별시 서대문구 연세로 50 연세대학교 제1공학관 472호 TEL : 02)2123-7457/8322 FAX : 365-4668
Copyright © 2009 i-SUSCOM All rights reserved / hong7@yonsei.ac.kr
Supported by ONTOIN